EV Charging Equipment
Summary
EV charging equipment ranges from Level 1 cords on 120 V outlets and Level 2 wall or pedestal chargers on 208 V or 240 V circuits to DC fast chargers fed by three-phase power, often networked with load management. Charging adds large loads to the electrical service, so EV-ready and EV-capable spaces, conduit, panel capacity, accessible charging spaces, and pedestal locations must be planned with the parking layout.
Cols
Terminology
- EVSE: electric vehicle supply equipment
- Level 1: 120 V outlet charging; slow
- Level 2: 208 V or 240 V AC charging; homes, workplaces, and destinations
- DC fast charger (DCFC): off-board DC charging, commonly 50 kW to 360 kW
- J1772: North American AC connector
- CCS: combined charging system; J1772 with added DC pins
- NACS (SAE J3400): Tesla-developed connector being standardized by SAE
- EV-capable / EV-ready / EVSE-installed: spaces with raceway only, a circuit and outlet, or a charger
- Power control / load management: limits total charging load on a service
Standards
Ratings
- DC fast chargers typically need 480 V three-phase service and utility coordination
- Accessible charging spaces required where charging is provided
Test standards
- UL 2594: electric vehicle supply equipment
- UL 2202: DC charging equipment for electric vehicles
- NFPA 70 (NEC): EV power transfer system requirements
- Energy and building codes: EV-ready and EV-capable space requirements where adopted
Components
- Charger: wall-mounted or pedestal Level 2, or DC fast charger cabinet and dispensers
- Circuit and raceway: branch circuit, conduit, and conductors
- Distribution: panels, switchboards, or transformers for large installations
- Network and payment: cellular or Ethernet connectivity, software
- Site elements: bollards, wheel stops, signage, and striping
Detailing
- Run conduit to future spaces during construction; retrofitting trenching is costly
- Locate chargers to reach both vehicles from shared pedestals
- Protect pedestals with bollards or curbs
- Provide accessible spaces with accessible routes to chargers and operable parts within reach ranges
- Use load management to share service capacity across many ports
Uses
Specific uses
- Single-family garages
- Multifamily parking structures
- Workplace and retail parking
- Fleet depots
- Highway and destination fast-charging hubs
Pros and cons
Pros
- Supports electrification and tenant demand
- Load management reduces service upgrades
- Networked chargers enable billing and monitoring
Cons
- Large electrical loads and service upgrades
- Trenching and utility work dominate costs
- Hardware and connector standards are changing
Manufacturing and cost
Construction
- Electrician installs circuits, conduit, and chargers; utility may upgrade service; network commissioning follows
Main manufacturers and suppliers
Trade association: NECA.
Typical costs
- Commercial Level 2, installed: about $3,000 to $15,000 per port
- DC fast charger, installed: about $50,000 to $250,000 per port, driven by electrical service and utility work
Sources
- AAA: types of EV chargers, https://ev.aaa.com/articles/types-of-ev-chargers/
- Lectron: EV charging technology explained (J1772, CCS, NACS), https://ev-lectron.com/blogs/blog/ev-charging-technology-explained
- Qmerit: how much does a commercial EV charging station cost, https://qmerit.com/blog/how-much-does-a-commercial-ev-charging-station-cost-the-3-top-factors-to-consider/
- Recharged: how much does a commercial EV charging station cost, https://recharged.com/articles/how-much-does-a-commercial-ev-charging-station-cost/
- UL Standards: UL 2202 DC charging equipment for electric vehicles, https://www.shopulstandards.com/standards/en/standard_2202
- AmpUp: electrician guide to EV charger installation, https://www.ampup.io/blog/electrician-guide-ev-charger-installation
- Wikimedia Commons: Electric vehicles plugged into lamppost illustration.svg, by domdomegg (CC BY-SA 4.0), https://commons.wikimedia.org/wiki/File:Electric_vehicles_plugged_into_lamppost_illustration.svg