IRC Floor Framing


Summary

The IRC floor framing provisions give span tables for sawn-lumber joists, minimum bearing, lateral restraint, limits on notching and boring, framing around openings, and cantilever rules. They let a floor be sized from a table, but spans, cuts, and cantilevers fall outside the tables quickly, so check them before details are fixed.


Cols

Scope

Terminology

Requirements

Materials and design

Support and restraint

Cutting and openings

Cantilevers and guards

Trusses and fire protection

Worked examples

Notching and boring a 2x10 joist

A 2x10 has an actual depth of 9-1/4 in.

Step Calculation Result
Maximum notch depth 9.25 ÷ 6 1.54 in.
Maximum notch length 9.25 ÷ 3 3.08 in.
Maximum bored hole 9.25 ÷ 3 3.08 in. diameter
Hole location 2 in. from top and bottom Hole centered in the middle 5.25 in. of depth
Notch location Not in the middle third of the span Notch within the outer thirds only

Cantilever and bearing

Check Requirement Result for 2x10 joists
Maximum cantilever Not more than the nominal joist depth 10 in.
Beyond the tables Cantilevers over the nominal depth Engineered design
Bearing on concrete 3 in. minimum Joists bear at least 3 in. on the concrete, or hangers are used

Header at a stair opening

An opening is 3 ft 8 in. wide.

Step Check Result
Header span 3 ft 8 in. is under 4 ft Single header, size of the joist
Trimmer Header within 3 ft of the trimmer bearing A single trimmer is acceptable

Coordination

Common issues

Standards

Sources