IEBC Additions


Summary

An addition must meet the building code for new construction, may not push the building past the height and area limits, and triggers a check of the existing structure: more than 5 percent added gravity load or more than 10 percent added lateral demand means upgrading the existing elements. The structural thresholds decide whether an addition can be built without reinforcing the existing building, so test them before design is fixed.


Cols

Scope

Terminology

Requirements

Heights and areas

Structure

Energy

Worked examples

Gravity check

A second-story addition raises the load on a first-floor column.

Step Calculation Result
Existing design load 100 kips Baseline
Load with addition 106 kips 6 percent increase
Threshold More than 5 percent Column must be replaced or altered
Option Lighter framing or relocated load path Reduce the increase to 5 percent or less

Lateral demand-capacity ratio

Step Calculation Result
Existing DCR without the addition 0.80 Baseline
DCR with the addition 0.86 (0.86 − 0.80) ÷ 0.80 = 7.5 percent greater
Check Not more than 10 percent greater Existing element may remain unaltered
If the DCR were 0.90 (0.90 − 0.80) ÷ 0.80 = 12.5 percent Exceeds 10 percent; strengthen the element

Area limit

A one-story Group B building of Type II-B, sprinklered, has 60,000 sq ft and a proposed 15,000 sq ft addition.

Step Source Result
Allowable area Table 506.2, B, II-B, sprinklered one story 92,000 sq ft
Combined area 60,000 + 15,000 75,000 sq ft
Check 75,000 against 92,000 Within the limit; no fire wall needed for area

Coordination

Common issues

Standards

Sources