Zoning Districts and Use Regulations
Summary
A zoning district is an area of the city mapped to a set of permitted uses and building standards, and a project's district is the first thing to find on any site. Reading the district's use table and dimensional standards tells whether the program is allowed and how large the building can be, before any design starts.
Cols
Scope
- Zoning districts and their regulations are set by each local ordinance and differ widely. Always verify the municipal code's definitions and the current zoning and map for the project parcel
- Covers how districts are organized, how to read a district's use and dimensional tables, and how districts differ from building code occupancy groups
- Use-specific detail is in the permitted, conditional, and accessory uses note, and the dimensional controls are in their own notes
Terminology
- Base district: the primary zoning classification of a parcel, such as a single-family residential district
- Zoning map: the adopted map that assigns every parcel to a district
- Euclidean zoning: use-based zoning that separates land uses into districts; by far the most prevalent form in the US
- Performance zoning: zoning that regulates the effects of a use (noise, traffic) instead of listing uses
- Form-based zoning: zoning that regulates building form and the relationship to the street rather than use
- Incentive zoning: zoning that allows added height or density in exchange for public benefits
- Mixed-use district: a district that allows residential and commercial uses together
- Use table (use matrix): table listing uses against districts and showing whether each is allowed
- Dimensional standards table: table of lot size, setbacks, height, coverage, and floor area ratio by district
- Rezoning (zoning map amendment): a legislative change of a parcel's district
Classification
District families
- Residential: single-family, two-family, and multifamily districts, usually ordered from lowest to highest density
- Commercial: neighborhood, general, and downtown districts, from small-scale retail to large mixed uses
- Industrial: light and heavy industry, distribution, and manufacturing
- Agricultural: farming and rural districts
- Open space: parks, conservation, and institutional campuses
Codes and naming
- District codes often start with R, C, or I, but there is no consistent system; the same code can mean multifamily housing in one city, five units per acre in another, and 5,000 sq ft lots in a third
- Always read the district's purpose statement and its tables rather than inferring from its code
Mixing uses
- Strict use separation limits mixed uses in many cities; in a survey of 25 cities, less than 5 percent of land allowed mixed residential and commercial uses
- Mixed-use districts, form-based codes, and overlays are the usual tools for allowing mixed development
Requirements
Reading a district
A district's rules sit in two places:
- Use table: lists each use and marks whether it is permitted by right, requires a conditional or special approval, is an accessory use, or is not allowed
- Dimensional standards table: minimum lot area and width, setbacks, maximum height, maximum lot coverage, and floor area ratio, sometimes by building type
- Supplemental sections cover parking, landscaping, signs, fences, and standards for particular uses
- Footnotes to the tables modify the entries; read every footnote
- Overlay districts add or replace rules for parcels they cover
Zoning versus building code
- Zoning decides the use, location, and size of buildings; the building code decides how a building is built and made safe
- Zoning uses its own use categories (such as restaurant or office), while the building code classifies by occupancy group (such as A-2 or B); one use can map to different groups depending on size and occupant load
- A project meets both sets of rules, and zoning approval usually comes before building permit review
Worked examples
Reading a use table
An illustrative use table for three districts, with P for permitted, C for conditional approval, and a dash for not allowed.
| Use | R-1 | C-1 | C-2 |
|---|---|---|---|
| Single-family dwelling | P | P | - |
| Multifamily dwelling | - | C | P |
| Restaurant | - | C | P |
| Office | - | P | P |
| Light manufacturing | - | - | C |
| Question | Answer |
|---|---|
| Can a restaurant be built in C-1 without a hearing? | No; it needs conditional approval |
| Where can a multifamily building be built as of right? | C-2 only |
| What is the first step for a light manufacturing use in C-2? | Apply for the conditional approval |
Reading a dimensional table
An illustrative dimensional row for an R-1 district.
| Standard | Value | Meaning on a 7,200 sq ft lot, 60 ft by 120 ft |
|---|---|---|
| Minimum lot area | 6,000 sq ft | Lot qualifies |
| Front setback | 20 ft | Building starts 20 ft back from the front line |
| Side setback | 5 ft each | Width available: 60 − 10 = 50 ft |
| Rear setback | 20 ft | Depth available: 120 − 20 − 20 = 80 ft |
| Buildable envelope | 50 × 80 | 4,000 sq ft |
| Maximum lot coverage | 40 percent | 7,200 × 0.40 = 2,880 sq ft footprint |
| Binding control | Coverage is smaller than the envelope | Footprint limited to 2,880 sq ft |
Coordination
- Survey and title: confirm the parcel's district on the official map and the lot area from the survey
- Planning staff: ask for a zoning verification or interpretation when the use is unusual
- Program: match the program's uses to the use table early, including accessory spaces such as home offices or detached units
- Overlays: check for overlay districts; they change both uses and dimensions
- Building code: classify the occupancy for each use at the same time; zoning use and occupancy group do not match one to one
- Future changes: pending rezonings and plan amendments can change the district during a long project
Common issues
- Assuming the code letter means the same thing everywhere: read the district purpose and tables
- Missing footnotes: footnotes change setbacks, heights, and allowed uses
- Confusing permitted and conditional: conditional uses need a hearing, time, and fees
- Ignoring overlays: a parcel in a base district may also sit in a historic, floodplain, or design overlay
- Treating a use as accessory: the accessory category has its own size and location limits
- Lot area differences: zoning may use net lot area after dedications while the survey shows gross area
Standards
- Local zoning ordinance and map: the controlling documents
- Comprehensive plan: the adopted policy that guides the district map
Sources
- Wikipedia: Zoning in the United States, https://en.wikipedia.org/wiki/Zoning_in_the_United_States
- Wikipedia: Special-use permit, https://en.wikipedia.org/wiki/Conditional-use_permit
- Wikipedia: Floor area ratio, https://en.wikipedia.org/wiki/Floor_area_ratio