Variances, Appeals, and Nonconforming Conditions
Summary
A variance is a discretionary exception to a zoning standard granted for hardship, an appeal challenges a zoning official's decision, and a nonconforming use or structure is a lawful existing condition that no longer meets current rules. These routes decide what can be done when a design or an existing building does not fit the ordinance, and each has strict tests and time limits.
Cols
Scope
- Standards, tests, and time limits are set by state law and each local ordinance. Always verify the municipal code's definitions and the current zoning for the project parcel
- Covers area and use variances, appeals of staff decisions, and nonconforming uses, structures, and lots
- Conditional uses are a separate approval and are in the uses note
Terminology
- Variance: a deviation from a municipality's land use rules, an administrative exception granted by a board or committee
- Area (bulk) variance: relief from dimensional rules such as setbacks or height; the most common type
- Use variance: relief that allows a use the ordinance does not normally permit
- Hardship: a burden from special conditions of the lot, not from the owner's circumstances
- Self-created hardship: hardship caused by the owner's own actions, which many boards do not accept
- Board of zoning appeals (board of adjustment): the body that hears variances and appeals
- Appeal: a request that the board reverse or modify a zoning official's decision or interpretation
- Nonconforming use: a use that was lawful when it began but no longer is allowed because zoning changed
- Nonconforming structure or lot: a building or lot that was lawful but no longer meets dimensional rules
- Grandfathering: informal term for legal protection of a nonconformity
- Amortization: a period after which a nonconforming use must end
- Spot zoning: granting a special use to a single parcel in a way that conflicts with the plan
Requirements
Variances
- A variance is a "constitutional safety valve" that protects landowners' rights; municipalities may need to offer it on request to avoid a regulatory taking
- Area variance: relaxes physical dimension rules such as setbacks or height limits when the lot's shape or slope makes compliance unreasonably burdensome
- Use variance: authorizes a use the ordinance does not allow; it resembles a special-use permit or a zone change, and where prohibited it may be treated as spot zoning
- Standard tests:
- The hardship arises from special conditions, typically the lot's physical configuration; an ordinary lot can be denied
- The applicant's financial or personal situation normally cannot be considered
- Approval creates no public health or safety hazard
- Approval grants no special privilege; similarly situated owners could obtain similar relief
- Unwarranted variances can lead to spot zoning claims, which most state laws prohibit
Appeals
- A zoning official's decision or interpretation can be appealed to the board of zoning appeals within a time stated in the ordinance
- Decisions of the board are generally reviewed by a court
- In some cities, denied applicants for related approvals, such as historic certificates, appeal to the board of zoning appeals; in others, the only appeal is to court
Nonconforming conditions
- Origin: a use authorized when it began but no longer allowed after zoning changed; secondary suites built before an ordinance are a common example
- Loss by discontinuance: a nonconforming use may end if the owner agrees or if it is not exercised for a set period, often cited as 21 years in many jurisdictions and shorter in many others
- Loss by destruction: in some jurisdictions a structure destroyed beyond a threshold, usually 50 percent, cannot be rebuilt as a nonconforming use; other jurisdictions allow rebuilding within a limited time, and dwellings are usually allowed to be rebuilt
- Replacement limits: local governments often prohibit replacing an older nonconforming mobile home with a newer nonconforming one
- Amortization: some states let a nonconforming use end after a period set by its value; such ordinances are generally upheld unless arbitrary, discriminatory, or unreasonable, and in some states they are unconstitutional
- Expansion and alteration: most ordinances limit enlargement or change of a nonconformity; the specific limits are local
Worked examples
Area variance
A lot is 50 ft wide where the district requires 60 ft, due to a pre-existing platting. The required side setbacks are 7 ft each.
| Step | Calculation | Result |
|---|---|---|
| Buildable width | 50 − (7 + 7) | 36 ft |
| Program need | 40 ft wide house | Does not fit |
| Request | Reduce each side setback to 5 ft | Buildable width 40 ft |
| Test | Hardship from the lot's shape, not the owner's preference | Likely supportable |
| Process | Application, notice, public hearing, board decision | Build the notice and hearing time into the schedule |
Nonconforming addition
An existing building sits 8 ft from the side lot line where 10 ft is required.
| Question | Answer |
|---|---|
| Is the building a legal nonconforming structure? | Yes, if it was built lawfully before the rule changed |
| Can a rear addition be built in line with the wall? | Often not by right; many ordinances prohibit extending a nonconformity |
| Can the addition be built at 10 ft or more? | Yes, if it complies with current rules |
| Relief | Variance to extend the wall at 8 ft |
Loss of protection
An illustrative ordinance with a 12-month discontinuance period and a 50 percent destruction threshold.
| Case | Check | Result |
|---|---|---|
| Nonconforming shop closed for 14 months | Ordinance sets a 12-month discontinuance period | Use lost; current zoning applies |
| Fire destroys 60 percent of a nonconforming building | Ordinance threshold 50 percent | Cannot be rebuilt as nonconforming |
| Fire destroys 30 percent | Below the threshold | May be repaired within the time allowed |
Coordination
- Pre-application meeting: ask staff whether a variance, a conditional use, an administrative adjustment, or a text amendment is the better path
- Survey and records: prove the lawful existing condition with permits, surveys, utility records, and photos
- Hardship case: document the lot's physical constraints with topography and survey
- Neighbors: notified neighbors can support or oppose; early outreach helps
- Building code: a variance from zoning does not waive building code or fire separation requirements
- Existing buildings: renovation or a change of use may trigger loss of protection
Common issues
- Self-created hardship: buying a lot or drawing a design that cannot comply is generally not hardship
- Financial hardship: cost or lost profit is normally not considered
- Use variance used as a shortcut: a use variance can resemble a rezoning and is harder to win
- Lapsed nonconformity: a use unoccupied beyond the period loses protection
- Expansion limits ignored: additions to nonconforming buildings often need approval
- Missing deadlines: appeal windows are short
Standards
- State zoning enabling act and local ordinance: tests and procedures
- Board rules of procedure: notice, hearing, and decision timelines
Sources
- Wikipedia: Variance (land use), https://en.wikipedia.org/wiki/Variance_(land_use)
- Wikipedia: Nonconforming use, https://en.wikipedia.org/wiki/Nonconforming_use
- Wikipedia: Zoning in the United States, https://en.wikipedia.org/wiki/Zoning_in_the_United_States