IEBC Change of Occupancy


Summary

When an existing building changes occupancy, the IEBC ranks the old and new occupancy by relative hazard and requires more upgrades when the new use is the higher hazard, covering egress, heights and areas, exterior walls, shafts, and fire protection. Hazard rank decides whether the existing building is accepted as is or must meet new-construction rules, so check the ranking tables before committing to a new tenant or use.


Cols

Scope

Terminology

Requirements

General and fire protection

Means of egress

Heights, areas, and exterior walls

Vertical shafts

Worked examples

Office to restaurant

An existing Group B office changes to a Group A-2 restaurant.

Step Source Result
Egress rank Table 1011.5: B is rank 4; A-2 is rank 3 Higher hazard; egress must meet the building code, with the listed exceptions
Heights and areas rank Table 1011.6: B rank 4; A-2 rank 2 Higher hazard; meet the building code's height and area limits for Group A-2
Sprinklers Building code threshold for A-2 Required where the new group triggers them (fire area over 5,000 sq ft or 100 occupants)
Occupant load New load for the restaurant Egress capacity must meet the new occupant load
Fire alarm Building code threshold for A Required where the new occupancy requires it

Warehouse to office

An existing Group S-1 warehouse changes to Group B offices.

Step Source Result
Egress rank S-1 rank 4; B rank 4 Equal hazard; existing egress elements accepted, new ones to code
Heights and areas rank S-1 rank 3; B rank 4 Lower hazard; existing height and area accepted
Interior finish Section 1011.3 New wall and ceiling finishes meet Group B
Egress capacity Section 1011.5.3 Check the new occupant load against existing exits

Escape window

Step Check Result
Existing sleeping room window Net clear opening At least 4 sq ft, 22 in. high, 20 in. wide
Replacement Largest standard size that fits the existing frame Accepted even if smaller than a new-construction window