The electrical service brings utility power into a building through a meter and service disconnect, and the load calculation sets the service size. The service location, equipment room, and disconnect placement fix large pieces of the site and building plan, so agree them with the utility and the electrical engineer in schematic design.


Cols

Scope

Terminology

Requirements

Load calculations

Service and disconnect

Working space at service equipment

Worked examples

Service size from load

A small office building with a calculated load of 72 kVA at 208Y/120 V, three phase.

Step Calculation Result
Current 72,000 ÷ (1.732 × 208) about 200 A
Service rating Next standard size above the calculated current 200 A or 225 A
Equipment Switchboard or main panel with a 200 A or larger main Space and clearances per the working space note

The same load at 480Y/277 V is 72,000 ÷ (1.732 × 480) = about 87 A, so a smaller service and a transformer for 120/208 V equipment.

EV charging load

Two 48 A EV chargers added to a 200 A service.

Step Calculation Result
Continuous charger load 48 A × 125 percent 60 A each
Combined 2 × 60 120 A of service capacity if all run together
Option A listed power control system (Section 120.7) Limit the combined load and avoid a service upgrade

Service location checklist

Item Decision
Meter location Utility approval; outdoors for a dwelling; accessible to the utility
Disconnect Outdoors on or within sight of a dwelling (2026)
Emergency disconnect Where a remote disconnect is used
Alternate sources Plaque at the service for PV and batteries

Coordination