Setbacks, Yards, and Build-To Lines


Summary

A setback is the minimum distance a building must sit back from a lot line, street, or other protected feature, and a yard is the open area that results; a build-to line works the other way by requiring the building to meet a line at the street. Together they define the buildable envelope on the plan, so measure them from the right line before testing a massing.


Cols

Scope

Terminology

Requirements

Who sets setbacks and why

Measuring

Build-to lines

Historic ranges

Worked examples

Buildable envelope

An illustrative R-1 lot, 60 ft by 120 ft (7,200 sq ft), with a front setback of 20 ft, side setbacks of 5 ft each, and a rear setback of 20 ft.

Step Calculation Result
Buildable width 60 − (5 + 5) 50 ft
Buildable depth 120 − (20 + 20) 80 ft
Envelope area 50 × 80 4,000 sq ft
Coverage cap at 40 percent 7,200 × 0.40 2,880 sq ft
Governing limit Smaller of the two Coverage governs at 2,880 sq ft

Corner lot

The same lot sits on a corner, with the code treating both street sides as front yards at 20 ft.

Step Calculation Result
Buildable width 60 − (20 + 5) 35 ft
Buildable depth 120 − (20 + 20) 80 ft
Envelope area 35 × 80 2,800 sq ft
Effect Envelope drops 1,200 sq ft Corner lots cost buildable area

Build-to range

A mixed-use district sets a build-to range of 5 ft to 15 ft from the right-of-way for 70 percent of the frontage.

Step Calculation Result
Frontage 100 ft 70 ft of facade must lie in the range
Remaining 30 ft May sit deeper, such as at a courtyard or entry
Check Distance measured from the right-of-way line Not the curb or the property line

Coordination

Common issues

Standards

Sources